Equinix JK1 Data Center

Owner : Equinix jk2

Location : Jakarta

Total IT Load : 2.6 to 70 MW

Year : 2025-Current

Scope Of Work:

  • UPS & STS System Installation PDU & RPP Installation MV Switchgear & Transformers Main LV Switchgear Generators & Bulk Fuel Oil .
  • Works General Electrical Installation (All Levels & Rooftop)Panel Positioning (TOU, FFU, GCP, Critical Panels)Auxiliary Power & Control Cabling (RMU Lv.2 – Lv.7)Cable Ladder & Conduit Installation MV & LV Cable Laying Gland, Grounding & Termination
  • UPS Installation Lithium Battery System ConnectionFan Wall & CRAH System Chiller Pump Power & Support (Rooftop)
    Verification Grounding & Lightning Protection Final Inspection & Handover

 

Construction date: 2025-Current
Location: Jakarta